Permits
Permit applications for work in the City of Meriden Right of Way and on City Utilities should be sent to publicworks@meridenct.gov
- Application to work within ROW (writable)
- License to Work (required for new companies)
- W9 Form: License to Work (required for new companies)
- Certificate of Insurance - SAMPLE
- $4,000 Drain Layer Bond
- Right of Way Bond
- Site Plan Requirements
- As Built Requirements
- Application for Dumpster
Engineering/Utilities Details
Water
- Meter Pit 1.5
- Meter Pit 2.0
- Monitor Cover
- Water Detail Sheet 1
- Water Detail Sheet 2
- Water Detail Meter Settings
Sewer
Sidewalk and Driveway
- Sidewalk and Driveway Detail Sheet - updated for 2019
Roadway
- Pavement Standards - updated for 2019
Storm
- Catch Basin Frame and Grate
- Catch Basin Tops - "Drains to Watercourse" - NPDES regulations require the City of Meriden to notify residents that water entering catch basins ultimately discharges into a brook, steam, wetland, etc.
General
Engineering/Utilities Specifications
Traffic
- Pedestrian Push Button and Sign-Piezo
- Fully Actuated Controller with Actuated Pedestrian Phase (16 Phase)
- Video Detection System Iteris
- Temporary Pavement Markings
Water
Sewer
- Sealing and Testing of Service Connection
- San PVC English 1
- CIPP Pipe Lining dot format
- San Manholes
- Cleaning, Inspecting, Sealing and Testing, and Spot Repair of Sewers
Sidewalk and Driveway
- Root Barrier
- Colored Concrete Sidewalk and Ramps
- Concrete Sidewalk and Ramps- updated for 2019
Roadway
- Hot Mix Asphalt Pavement-2013-References Removed
- Hot Mix Asphalt Pavement-2013-References
- Leveling Course
- Milling and Full Depth Removal
- Remove Stone Curbing
- Bit Concrete Driveway Prep
- Bit Concrete Patching
Storm
- Catch Basin Inlet Manholes
- Underdrains
- Flood Plain Development Application
- New FEMA Flood Insurance Mapping Announcement
General